Fleabitten

Thursday, March 29, 2007

Long day

Another beautiful day but cooler.

I am sooooooooo tired. It took an hour and 1/2 to get to work this AM. Traffic was a b----. I worked for a nice couple who checked in on me every 2 minutes to make sure I didn't need anything. This breaks my train of thought and bugs the heck out of me. The light fixture in the first bath proved to take extra time taking it loose and putting it back but I persevered. Then there was the strip of paper with a defect that I had to replace. Then she wanted me to cut one of the stripes from the left overs to add as a top border.

Bath #2 I had estimated to take 4 rolls of paper with no repeat and 5 rolls with a repeat. Guess what??? She bought 4 rolls of a paper with a large repeat. So I tried my darndest to get it to work out (which takes lots of time and thought) and still ran 1 strip shy of finishing. Now she has to reorder and I'll have to return to hang 1 lousy strip at a later date.

Bath #3 will have to wait till tomorrow.

At about 4:45 I hit the road to make the trek home, which took until 6:00 in rush hour traffic. Oh, the joys of city traffic!!!!

0 Comments:

Post a Comment

<< Home